All First-Year Residence Halls to Have Air Conditioning Effective Fall 2023

Over the summer, window units will be permanently installed at John Jay, Hartley and Wallach Halls.

May 02, 2023

Starting this August, John Jay, Hartley, and Wallach Hall residents will have the ability to cool their rooms during warmer weather. Bedrooms across these three buildings will be fitted with a permanent window air conditioning unit over the summer of 2023. The units will remain in-room for the duration of the academic year and will be installed with all-weather proofing and insulation in preparation for the cooler seasons.

Carman Hall and Furnald Hall have central air-conditioning.